Sod arrived today 7 days after the 2019 phase of "the Project got started. 38,400 sq.ft, almost a acre of Santa Anna Hybrid Bermuda was installed on our #17 fairway. The contractor who is stripping and preparing the surrounds is almost finished with that process. By the end of next week we will be very close to having all of the stripped dirt on the course covered with new sod, just over two weeks after we got started.
Below are some pictures of todays sod install and the hole closures for tomorrow which we send to the golf shop for the AM email blast.
Holes #'s 17-18 & 11 closed AM. #'s 17, 2 & 12 will be closed in the PM.
#'s 1,4,8,9,10,13,14,15,16,18 are stripped and have a drop area in front of the green.
No delay
Carts scatter
Summer rules
Sod Arrives |
It does not take these guys long to get the sod on the ground. |
Installation of the big rolls |
Pulling the seams together. |
Getting it wet, really wet. |
Close to a acre of sod down. |