Sunday, March 7, 2021

The Project 2021 - Update #6

 Below are some pictures of end of the week progress this past week. As you can see we are now utilizing drone technology to capture images and video. More to come next week.

Thanks as always for your support and patience.



Good image from above showing new bunkering, green expansion and new shaping of the Tilley's putting green as well as new drainage ditch to repair flooding issues into Tilley's Pub. Close near the cart path you can see the outline of the expanded patio as well as cart path.


You can get a good feel for the shape of  new LH fairway bunker on #9. Designed to challenge the low handicapper from the new championship tee moving back and too the left 10 or so yards. It will take 270 yards to carry this bunker from the new tee.


Across from the new LH bunker on #9 is a newly shaped bunker on the RH side of the fairway. The large dirt cut in front of the bunker was removed so the front edge of the bunker would be visible  from the tee. This bunker will be slightly smaller with added texture in the edges.


#1 green and bunker getting restored.